The Wicks Place project has reached another exciting milestone with the structural topping out of Buildings A and B (along Victoria Road).
The milestone means that Tower Crane 1 which services Buildings A and B can be dismantled and removed from site.
The structural topping out of Buildings C, D and E and the removal of Tower Crane 2 is on track to be completed in early 2023.
Keep In Touch